Snohomish County · Property transfer · From Nov 1, 2026

Selling a home with septic in Snohomish County: the new inspection rules

Get matched with a certified septic professional for your home-sale inspection. Since November 1, 2026, Snohomish County sellers need a full septic inspection by a certified septic contractor within the past 12 months and a Report of Property Transfer from the Health Department before closing.

The rule in brief

  • Applies to sales of properties on septic in Snohomish County closing on or after November 1, 2026, including commercial and multi-unit properties. It does not apply on Tribal Trust land.
  • Inspection: a full inspection by a certified septic contractor within the past 12 months.
  • Pumping: only if the inspection report recommends it, and done by a certified septic contractor.
  • Records: an as-built on file with the Health Department, or a site plan prepared by a certified septic contractor.
  • Report of Property Transfer (RPT): the seller applies online, pays the fee, and gives the reviewed RPT to the buyer at transfer. It is valid for 12 months from acceptance.
  • Exempt: systems installed within the past 12 months.

These are the Snohomish County Health Department’s rules. Homes across the county line in King County follow King County’s own time-of-sale rule instead (see the comparison below).

Seller steps, in order

  1. Check your records. Look up the property on OnlineRME to see whether an as-built is on file and when the system was last inspected or pumped. Our Snohomish County septic records guide walks through it.
  2. Book a full inspection with a certified septic contractor. It must be within the 12 months before you apply. The Health Department publishes a list of certified contractors.
  3. Pump the tank if the report recommends it. Pumping must also be done by a certified septic contractor.
  4. No as-built? Get a site plan. A certified septic contractor completes the Health Department’s On-Site Sewage System Site Plan form, and you submit it with your application. If an as-built exists but is inaccurate, a site plan is optional, but the discrepancies must be noted on the inspection report.
  5. Apply for the Report of Property Transfer online and pay the fee. Forms and the application are at snohd.org/PropertyTransfer.
  6. Get the reviewed report back. The Health Department reviews your application and septic records and returns the RPT either with no deficiencies noted or with deficiencies noted. If you fix them, you can email [email protected] to ask for a re-issued report.
  7. Give the buyer the paperwork at transfer: the reviewed RPT, the system’s maintenance records and the seller disclosure statement (chapter 64.06 RCW).

Timing tip for sellers

The inspection, any pumping or site plan, and the Health Department’s review all have to happen before closing. Starting before you list leaves room for each step, and an inspection done up to 12 months ahead still counts.

Who can do the inspection

The Health Department requires a certified septic contractor. It certifies septic professionals each year and publishes a septic contractors list that marks each company’s certifications: M for Monitoring & Maintenance Specialist, P for Pumper and I for Installer. The department suggests contacting at least three companies.

If you’d rather not call around, tell us about the property and the closing date. We’ll call you back and help you find a certified septic professional for the inspection and any pumping.

If you’re buying

  • Ask for the reviewed Report of Property Transfer, the maintenance records and the seller disclosure statement. The seller must provide them at transfer.
  • Read the deficiencies, if any. The Health Department does not hold up the sale, so who fixes what is part of your negotiation with the seller.
  • Check the property on OnlineRME for past inspections and pumping. After closing, the routine inspection schedule is yours to keep: every 3 years for a gravity system, and every year for alternative systems unless the manufacturer specifies otherwise.

The statewide rule from February 1, 2027

Washington’s septic rules (WAC 246-272A-0270) add a property-transfer inspection everywhere in the state from February 1, 2027: the owner must get an inspection by a third-party inspector authorized by the local health officer and submit the results to the local health jurisdiction. The local health officer can drop the requirement when there is evidence the system is compliant and was inspected by an authorized third-party inspector. Sellers must also give the buyer all available maintenance and repair records with the disclosure statement.

Snohomish County’s rule already applies to sales closing from November 1, 2026.

Snohomish County vs King County at a glance

Home-sale septic requirements by county
Snohomish CountyKing County
Who regulatesSnohomish County Health DepartmentPublic Health – Seattle & King County
Who inspectsCertified septic contractorLicensed On-site System Maintainer
How recentWithin the past 12 monthsValid for 12 months
PaperworkReport of Property Transfer, reviewed by the Health DepartmentTime-of-sale inspection report filed with the county

Selling on the King County side, for example in Woodinville or Cottage Lake? See King County septic inspection for home sales.

Selling a Snohomish County home on septic?

Tell us the area and your closing date. We'll call you back and help you find a certified septic professional for the inspection and any pumping.

Get matched with a certified inspector

Home-sale septic questions

Do I need a septic inspection to sell my house in Snohomish County?

Yes, for sales closing on or after November 1, 2026. The seller needs a full inspection by a certified septic contractor within the past 12 months, pumping if the inspection report recommends it, and a Report of Property Transfer reviewed by the Snohomish County Health Department. Systems installed within the past 12 months are exempt.

What is a Report of Property Transfer (RPT)?

It is the Health Department’s review of your septic records and inspection. The seller applies online and pays a fee. The department sends the report back with or without deficiencies noted, and the seller gives the reviewed report to the buyer. It is valid for 12 months from acceptance.

Can the Health Department stop my sale?

No. The Snohomish County Health Department says it cannot delay or stop a property sale. If the report notes deficiencies, correcting them is up to the owner. Surfacing sewage or an immediate health hazard can lead to a site visit and enforcement against the current owner.

What if there is no as-built drawing for the septic system?

A certified septic contractor completes an On-Site Sewage System Site Plan on the Health Department’s form, and the seller submits it with the Report of Property Transfer application.

Does the new Washington State rule change anything?

From February 1, 2027, state rules (WAC 246-272A-0270) require a property-transfer inspection by a third-party inspector authorized by the local health officer, everywhere in Washington. Snohomish County’s own requirement already applies to sales closing from November 1, 2026.

Get matched with a certified septic inspector

How it works Free for homeowners

  1. Tell us what you need Pumping, an inspection, a repair or records help, and roughly where the property is.
  2. We call you back We ask a few questions, such as your system type, so the right kind of provider is matched.
  3. We connect you with a licensed provider you approve Your details go only to the provider you agree to. Price and timing are set between you and them.
We'll call you back on this number.
No street address needed.
For example: your system type if you know it (gravity, mound, pressure, ATU), when it was last pumped, or what you're noticing.

This is a callback form, not an emergency line. If sewage is backing up into your home, call a licensed septic pumper directly.