Septic system design and permits in King and Snohomish County

Every new septic system, replacement and major repair here starts with a design by a state-licensed designer or engineer, approved by the county health department before an installer can get a permit. Tell us about your project and we'll connect you with an independent licensed designer you approve.

What a septic designer does

A septic designer turns your lot into a buildable, approvable system. In King County the designer evaluates the soil and site, decides which type of system the site needs, prepares the site design application for Public Health – Seattle & King County, checks the site before installation, inspects the work, and files the final record drawing (your future as-built). For repairs, the designer must also work out what caused the old system to fail so the new design addresses it.

You'll need one for:

  • a new system on a lot without sewer;
  • a replacement or major repair, including any work on a failing drain field (see drain field repair and replacement);
  • some remodels and additions, especially added bedrooms, when the county asks for a professional evaluation or a system upgrade.

Who can design a septic system

  • Licensed on-site sewage system designers. King County's code requires a designer's license issued by Washington State (chapter 18.210 RCW). The Department of Health notes designers are licensed through the state Board of Registration for Professional Engineers and Land Surveyors.
  • Licensed professional engineers (sanitary, civil or agricultural, chapter 18.43 RCW).
  • A resident owner, in narrow cases. In King County you may design a gravity system for your own single-family home if the drain field area has at least 4 feet of original permeable soil with 3 feet of vertical separation, the property isn't on a shoreline, you design no more than one system a year, and a licensed designer, engineer or soil scientist does the soil evaluation.

King County lists licensed designers and engineers at kingcounty.gov/septic/professionals. The designer named on the site application generally can't also be the installer applying for the permit, except for repairs of a failed system.

The soil evaluation (the “perc test”)

What people call a perc test is, in King County's code, a soil and site evaluation by the designer. For a single-family home it means digging soil logs: at least four test pits, each at least 3 feet across and at least 20 feet apart, in the proposed primary and reserve drain field areas, plus one where the tanks will go, dug 3 feet below the planned bottom of the drain field (but not below the water table). The designer records the soil texture, structure, compaction and the highest seasonal water table.

The result decides the system type. The Department of Health gives these rough soil depths:

Native suitable soil beneath the drain field and the system it usually allows (WA Department of Health)
Native suitable soilSystem typeKing County inspection
3 feet or moreGravity (tank and trench drain field)Every 3 years
About 2–3 feetPressure distribution (pump-dosed)Every year
About 1–2 feetMound (raised sand-fill drain field)Every year
About 1.5 feetSand filterEvery year
About 1–1.5 feetAerobic treatment unit (ATU) as pretreatmentEvery year
As little as 1 footBioFilter (proprietary, no separate drain field)Every year

Less soil generally means more components (pumps, sand, treatment units) and an annual inspection by a licensed maintainer, which matters for the long-term cost of owning the system. See what drives septic system cost.

King County permit steps, from design to as-built

King County's site development flow chart for new systems runs like this:

  1. Critical areas check with the permitting agency for your property.
  2. Site design application. The licensed designer or engineer submits it to Public Health with the soil logs and a plan. Water supply must be approved first if you're on a private well.
  3. Design approval (or a written denial with the reasons and your right to appeal).
  4. Building permit for the house, applied for by the owner.
  5. Installation permit. A certified master installer applies; the designer does a pre-installation ("stub-out") inspection; then Public Health issues the permit.
  6. Installation and inspections. The installer builds the system, the designer inspects it, and Public Health inspects it before it is covered.
  7. Backfill and cover inspection by the designer.
  8. Record drawing. Within 30 days the designer submits the record drawing, and Public Health reviews it. No one may occupy a new building before this is done.

Timing to plan around

A design approval expires after 3 years unless a building permit application has been accepted, and an installation permit expires 3 years after it's issued.

Planning a new or replacement septic system?

Tell us about the property and the project. We'll call you back and connect you with a licensed septic designer you approve.

Get matched with a septic designer

Designs for repairs and replacements

When a drain field or other major part fails, King County requires a site design (chapter 13.28) for the repair or replacement, and the designer has to identify and address the causes of the failure. Smaller work can go through the county's repair proposal form, which can be submitted by a master installer, designer, engineer or On-site System Maintainer; the county may still ask for a full site application if the site is complex. Minor repairs such as replacing a pump, float or baffle don't need a design or permit when the drain field isn't failing. More on this in septic repairs: what needs a permit.

Remodels, additions and extra bedrooms

King County requires a Public Health building application before most building permits on a property with septic. An inspector visits and reviews the system's age, condition, type and location, whether there's a reserve drain field area, and your as-built and permit history. Because bedrooms set the size of the septic system, adding one can trigger an evaluation by a licensed septic professional or a system upgrade. Tearing a house down to the foundation and rebuilding, for example, requires a new septic system. Start by pulling your septic records and as-built.

Septic design in Snohomish County

In Snohomish County the Snohomish County Health Department runs the permits. Its steps start the same way: hire a licensed designer or professional engineer, who submits the Application for an On-Site Sewage System Permit with the design. The department reviews the application and visits the property to check the design against code, and the system can be installed once the permit is issued. Some forms, including the permit application and the as-built, can only be submitted by a licensed designer or engineer. See the department's septic permit steps and our Snohomish County septic guide.

How we help

We don't design septic systems. We're an independent referral service: tell us about the property and the project, we call you back, and we connect you with an independent licensed designer or engineer you approve. Fees, timing and the design are agreed directly between you and them. The Department of Health suggests asking any designer what's included (site evaluation, design package, inspections, the as-built package and health department fees). We're still building relationships with designers, so if we can't find someone suitable for your area, we'll say so.

Septic design questions

Who can design a septic system in Washington?

An on-site sewage system designer licensed by the state, or a licensed professional engineer. In King County, a resident owner may design a gravity system for their own single-family home only on sites with at least 4 feet of original permeable soil, and the design still needs a soil evaluation by a licensed designer, engineer or soil scientist.

Is a perc test required in King County?

King County’s code asks for a soil and site evaluation by the designer, documented with soil logs: for a single-family home at least four test pits in the proposed primary and reserve drainfield areas, plus one where the tanks will go. That evaluation, often called a perc test, decides what type of system the site needs.

How long is an approved septic design good for in King County?

Plan approval expires three years after approval unless a building permit application has been accepted for the building the system serves. An installation permit also expires three years after it is issued.

Do I need a septic designer to add a bedroom?

Possibly. In King County, remodels and additions on septic need a Public Health building application before most building permits. The county says the number of bedrooms equals occupancy equals the size of the septic system, and some projects require an evaluation by a licensed septic professional or a system upgrade. The county asks owners to call its septic expert line before adding a bedroom.

Get connected with a licensed septic designer

How it works Free for homeowners

  1. Tell us what you need Pumping, an inspection, a repair or records help, and roughly where the property is.
  2. We call you back We ask a few questions, such as your system type, so the right kind of provider is matched.
  3. We connect you with a licensed provider you approve Your details go only to the provider you agree to. Price and timing are set between you and them.
We'll call you back on this number.
No street address needed.
For example: your system type if you know it (gravity, mound, pressure, ATU), when it was last pumped, or what you're noticing.

This is a callback form, not an emergency line. If sewage is backing up into your home, call a licensed septic pumper directly.